UMS Wright Baseball Field

Owner's Name: UMS Wright Prepatory School

Owner's Contact Person: Tommy Akridge

Project Description/Scope of Work: install 6,000 l.f. of Hydraway 2000 1”x 6” panel drains in 3” (w) x 12” (d) trenches backfilled with free draining sand in the outfield of the existing baseball stadium. Drain lines were installed 15’ on center in a herringbone pattern beginning at the skinned area extending to each foul line with a collector pipe along center line of field and surface draining into swale beyond outfield fence.